the project

Weldall reduced setup times from 6 or 7 hours to 1.5 hours on some parts and achieve 100% accuracy.

the challenge

Metal forming shops, regardless of the size of the operation or the projects they tackle, are all faced with the task of laying up parts for assembly. It requires precision and time – a lot of time.

the solution

The Iris SPS enabled Weldall to reduce setup times from six or seven hours to 1.5 hours on some parts and achieve 100 percent accuracy.